Abstract

A quantitative pipeline integrity analysis based on structural-reliability methods has been used to establish corrosion re-assessment intervals from in-line inspection data. This process, as implemented in a simulation-based software package, incorporates in line inspection (ILI) data, physical and operation characteristics of the pipeline, corrosion growth rate projections, and the uncertainties inherent in this information, to estimate the probability of failure (POF) as a function of time. Using this approach, the POF value is calculated on a joint-by-joint basis and the calculated values are then compared with an acceptable POF level to verify the integrity of each joint in any given year. Based on this information a re-assessment interval is established and selected joints are targeted for excavation and repair to ensure that the acceptable POF level is not exceeded.

Author: Sporns, R., Bott, S. and Playdon, D.

Publisher: International Pipeline Conference

Year Published: 2006

Purchase Link: ASME Digital Collection

RELATED CONTENT

Filter by
Post Page
Insights Piramid Media Room Latest News - Piramid Latest News - Home Page
Sort by
2020-06-04

0

Do you have a question or comment?

If you are interested in our engineering or testing services, want a demo of a software product, want to join a joint industry project, or are interested in a training course, we want to connect with you.

Please complete the contact form and we will respond within 48 hours.

Follow us on LinkedIn to keep up-to-date on the latest happenings at C-FER.