LP-SAGD: Wellbore Architecture Alternatives Joint Industry Project
LP-SAGD: Wellbore Architecture Alternatives JIP
Most SAGD projects have used a combination of high-pressure steam injection, natural steam lift, and gas lift to transport the produced fluids to surface. Learn how companies in the Athabasca oil sands are using artificial lift to bring the produced fluids to the surface due to depleted or naturally low pressured gas and water which makes it necessary to operate wells at a much lower pressure.
(175.1 KB, PDF)
|
|